Come Celebrate our Journey of 50 years of serving all people and from all walks of life through our pictures of our celebration extravaganza!




















Come Celebrate our Journey of 50 years of serving all people and from all walks of life through our pictures of our celebration extravaganza!



















Hughes, Fields & Stoby
62 Hadfield & Cross Streets
➢ The Protocol Concerning Pollution from Land-Based Sources and Activities
❖ The Minamata Convention on Mercury, which aims to protect human health and the environment from anthropogenic emissions and releases of mercury and mercury compounds.
❖ The Stockholm Convention on chemicals management, which aims to protect human health and the environment from chemicals that persist for long periods, bioaccumulate in living tissue, and travel long distances across borders.
❖ The IMO Conventions
➢ International Convention for the Prevention of Pollution from Ships 1973, as modified by the Protocol of 1978 relating thereto and by the Protocol of 1997 (MARPOL)
➢ International Convention on the Control of Harmful Anti-fouling System on Ships (AFS) 2001
➢ International Convention on Oil Pollution Preparedness, Response and Co-operation (OPRC) 1990
➢ International Convention for the Control and Management of Ships’ Ballast Water and Sediments 2004
➢ International Convention for the Prevention of Pollution from Ships 1973
➢ Convention on the Prevention of Marine Pollution by Dumping of Wastes and Other Matter (LDC) 1972
III. Applications for Environmental Authorisations.
The Act and the Environmental Protection (Authorisation) Regulations (herein the “Regulations”) contain in some detail the process for securing environmental authorisation for projects. However, before summarising the process, it is important to note the definition of project as per the Act. A project is defined as “the execution of construction works or other installations or schemes, any prescribed process or alteration thereof, any interference with any ecosystem or any other activity in the natural surroundings or landscape including those involving the extraction of natural resources”, per Article 10 of the Act. As stated above, Article 11 states that any project listed or any other project likely to significantly affect the environment must apply to the Agency for a permit. The Article sets out what needs to be included when making an application, this is -
❖ The site, design, and size of the project;
❖ Possible effects on the environment;
❖ The duration of the project;
❖ A non-technical explanation of the project.
Where it is not clear whether a project will significantly affect the environment, the developer shall submit to the Agency a summary of the project and the Agency shall make a judgment on whether it will not significantly affect the environment thus will be exempt from an EIA or the Agency may find that the project has the potential to significantly affect the environment and request that an EIA be conducted. Anyone affected by the decision to waive an EIA may appeal with the Environmental Assessment Board.
Environmental Impact Assessments
Every EIA shall be carried out by an independent and suitably qualified person approved by the Agency and shall -
❖ Identify, describe and evaluate the direct and indirect effects of the proposed project on the environment including, but not limited to,
➢ Human beings, flora, fauna and species habitats, water, air and climatic factors, natural resources, including how much of a particular resource will be degraded or eliminated and how quickly the natural system may deteriorate, among other things.
❖ Assess every project with a view to the need to protect and improve human health and living conditions and the need to preserve the stability of ecosystems as well as the diversity of species.
Furthermore, as per Article 11(5), it should contain, but is not limited to, the following information -
❖ The main characteristics of the production process, including the nature and quantity of the materials used, plans, drawings and models;
❖ An estimate by type and quantity of expected contaminants, residues and emissions (water, air and soil pollution, noise, vibration, light, health and radiation) resulting from the operation of the proposed project;
❖ An outline of the main alternatives studied and the main reasons for the choice, considering the environmental factors;
❖ A description of the likely significant effects of the proposed project on the environment resulting from the existence of the project
❖ Emissions of contaminants, creation of nuisance and creation of waste
❖ A description of the hazards or dangers which may arise;
❖ An emergency response plan for containing and cleaning up any pollution or spill of any contaminant.
Members of the public have 28 days to make written submissions to the Agency setting out the questions and matters which they require to be answered or considered in the EIA. Finally, it is important to note that all expenses of the EIA process shall be borne by the developer.
A decision to issue an environmental permit shall be subject to conditions which are reasonably necessary to protect human health and the environment and shall contain, but is not limited to, -
❖ The Agency having the right to cancel or suspend the environmental permit in cases of breach of terms or conditions;
❖ The Agency being satisfied that the developer can comply with the terms and conditions of the permit;
❖ The Agency being satisfied that the developer can pay compensation for any loss or damage which may arise from the project or breach.
The holder of the environmental authorisation shall take all reasonable steps to -
❖ Avoid all adverse environmental impacts which could result from the activity;
❖ Minimize the adverse environmental impact where the avoidance is impractical;
❖ Mitigate the impact where the impact cannot be avoided.
They shall also establish an environmental monitoring programme at their own expense or bear the cost of such a programme. Furthermore, the holder of the authorisation shall report all instances of anticipated non-compliance to the Agency and shall give advance notice to the Agency of any planned changes in the authorised facility or activity.
Grounds for refusal.
The Agency may refuse to grant an environmental permit under the Regulations where it has reason to believe that the application contains or is based on false or misleading representation or information which is false in a material particular or where in the opinion of the Agency, the issue of the environmental authorisation would not be in the best interest of Guyana, having regard to such factors as the Agency considers relevant to the protection to human health or the preservation of the character of the environment, including animals and plants; among other reasons as per Article 13.
Timelines
The decision to issue an environmental authorisation can take up to six weeks and unless cancelled by the Agency, shall be effective until a fixed date specified in the authorisation, which shall not be beyond five years. Interim authorisations can be issued by the Agency and will be effective for a period not exceeding a year in instances where the Agency cannot determine whether an authorisation should be granted.
Monitoring
The Agency may, if it appears to it that by reason of an emergency it is necessary to do so, carry out work on the land or in relation to plant or equipment on the land to which the environmental authorisation relates or, as the case may be, in relation to the mobile plant to which the authorisation relates. This is to ensure that the activities authorised by the environmental authorisation do not cause pollution of the environment or harm to human health or become seriously detrimental to the amenities of the locality. All expenses incurred by the Agency in this regard shall be borne by the holder of the environmental authorisation.
Renewal
Where a holder of an environmental authorisation wishes to continue an activity in respect of which an authorisation was granted beyond the expiration of an environmental authorisation, the holder shall submit an application for a new environmental authorisation to the Agency together with the fee. This application shall be made at least six months before the expiration of the original authorisation, as per Article 22 of the Regulations. During the consideration of the renewal, the Agency may carry out physical inspections and specify other standards or conditions that need to be complied with. Where there has been no material change in circumstances from the time the original authorisation was granted, the Agency will grant the renewal.
Cancellation, suspension and modification of environmental authorisation
The Agency may at any time by notice in writing to the holder of the permit, cancel or suspend an environmental authorisation or impose conditions as the Agency considers appropriate in addition to or in place of the existing conditions, with effect from such date as the Agency may specify provided that the cancellation, suspension or modification shall not give rise to an additional adverse effect, as per 14 of the Regulations. They can do so for several reasons -
❖ The holder of an environmental authorisation made a misrepresentation or willful omission in obtaining the environmental authorisation or in any report submitted to the Agency or in any other way obtained the environmental authorisation improperly
❖ The holder of an environmental authorisation is contravening any material condition of the environmental authorisation
❖ There is a violation of any condition of the environmental authorisation
❖ There are changes in circumstances relating to the authorisation that require either a temporary reduction in the discharge of contaminants
❖ The Agency establishes new or revised standards in respect of the operations of the facility
However, the Agency shall not cancel the environmental authorisation if the Agency considers it is contrary to the public interest to do so, it may still be suspended.
Fees
The Regulations contain the applicable fee schedule. The fees differ depending on the scale of the project and environmental authorisations start from $100 per year and go up to $1500 per year, depending on the scale of the project. Other fees include the application for environmental authorisation, the application for written authorisation of changed conditions and fees for surrender of environmental authorisation, among other things.k-en-Rust
IV. Prevention and Control of Pollution
As per Article 19 of the Act, a person shall not
❖ (a) Undertake an activity that causes or is likely to cause pollution of the environment unless the person takes all reasonable and practicable measures to prevent or minimise any resulting adverse effects
❖ (b) Nor shall they discharge or cause or permit the entry into the environment of any contaminant in any amount. Concentration or level in excess of that prescribed by the regulations or stipulated by any environmental authorisation
In the event that the above is contravened, the person must immediately identify the agency of certain information such as the discharge; the concentration and amount of the contaminant; what action the person has taken or intends to take to restore the natural environment; among other things.
Furthermore, the person will be liable for a criminal offence and subject to certain penalties.
V. Enforcement.
Several cascading enforcement methods are available to the Agency under the Act.
❖ Enforcement notices: If the Agency believes that a person is contravening any condition of any environmental authorisation, or is likely to contravene any such condition, the Agency may serve on him an enforcement notice. This will state the steps that must be taken to remedy the contravention or to remedy the matters making it likely to arise and a timeframe for such to be done, as per Article 26.
❖ Prohibition notices: Article 27 states that where it appears to the Agency that an activity in any area is such as to pose a serious threat to natural resources or the environment or risk of serious pollution of the environment or any damage to public health, the Agency shall serve on the person responsible a prohibition notice. This shall contain, inter alia, an order for the immediate cessation of the offending activity. The Agency can serve these whether or not the activity is subject to any environmental authorisation. Anyone who is not satisfied with a decision by the Agency can appeal to the Environmental Appeals Tribunal.
❖ Investigations: Article 35 of the Act gives the Agency the power to enter premises at any reasonable time when it has reason to believe it is necessary for them to enter and examine and investigate; to take such measures and photographs and make such recordings they consider necessary; take samples of any articles or substances found as well as take possession of and detain them for as long as is necessary; among other investigatory powers.
❖ Injunctions: Where the Agency believes that a person has, is about to, or is likely to do any act or thing constituting or directing the commission of an offence under the Act, an officer of the EPA may make an application to the High Court requesting that the court make an order which requires the person to either refrain from doing a particular thing, or to do a particular thing which would prevent the commission of an offence.
❖ Offences:
➢ Failure to carry out an EIA or commence a project without obtaining an environmental permit is an offence.
➢ Any person who contravenes a condition contained in any enforcement notice or fails to give information required by the Agency within the time specified by the Agency shall be guilty of an offence. ■ Furthermore, statements made which are known to be false or misleading or recklessly made statements which are false or misleading in a material respect, shall be guilty of an offence.
➢ Regarding corporate bodies, where an offence is proved to have been committed with the consent or connivance of, or to have been attributable to any neglect on the part of, any director, manager, secretary or other officer of the body corporate or a person who was purporting to act in such capacity shall be liable to the proceedings and punished, as will the body corporate.
❖ Civil proceedings: Any person who has suffered loss or damage as a result of the commission by any person of any offence under this Act or any conduct that is contrary to the Act, or regulations, may sue for the recovery of an amount equal to the loss or damages proved to have been suffered and an amount to compensate for the costs of any investigation in connection with the matter.
➢ Similarly, any person who suffers or is about to suffer loss or damage as a result of a breach of any provision of this Act or the regulations may seek an injunction from the High Court.
VI. Notable Court Decisions.
The EPA has in recent years been subject to a number of lawsuits, brought largely by citizens, residents and environmental activists, challenging how it has issued, renewed and enforced permits for the country’s fast-growing oil and gas sector, and testing whether it has met its statutory duties under the Act. A few notable cases are below.
Collins and Whyte v. EPA
Collins and Whyte argued that the environmental authorisation issued to Esso required Esso to provide insurance and unlimited parent company guarantees from its parent company in the event environmental damage occurred, and as it didn't, the EPA was in breach of its statutory duty. The Agency and other respondents argued that the Applicants had no locus standi to institute the present claim and that there was no such obligation. The Court, however, disagreed, stating that the applicants’ claim was not frivolous, vexatious, or speculative nor are the Applicants to be considered meddlesome busybodies. Furthermore, the arguments made by the Agency and Esso were entirely without merit and have no basis in law, fact and circumstance, thus, the Agency has, in the circumstances, by its decision and omission, committed an illegality, acted unlawfully, ultra vires, unreasonably in the Wednesbury context of unreasonableness, in defiance of logic, irrationally and without any jurisdiction.
This case is currently ongoing as Esso and the Agency appealed to the Court of Appeal, where the initial judgment was overturned. Collins and Whyte have since appealed to the CCJ.
Thomas v. EPA
Dr Troy Thomas filed a case in the Supreme Court, alleging that the 23-year environmental permits the EPA had issued to Esso Exploration for oil exploration violated regulations under the Environmental Protection Act that limited such permit lengths to five years. The EPA had issued permits to Esso that ran through 2040 and 2043 for the Liza 1 and 2 projects.
Thomas argued that issuing such a long permit in violation of law exposes Guyana and the rest of the world to serious, if not irreparable, harm and adverse consequences from climate change. He averred that continued investment in oil is contrary to the goals of the Paris Agreement, a treaty Guyana has ratified.
The Supreme Court of Guyana issued a consent order accepting a settlement between Thomas, EPA, and Esso where the EPA agreed to reduce the term of the permits to five years.
Morris and Marcus v. EPA
Morris and Marcus brought judicial review proceedings against the EPA for failing to require the inclusion of Scope 3 emissions in the EIA for ExxonMobil’s Hammerhead project. They argued that the EPA failed in its statutory duty to require comprehensive EIAs under the Act.
The court ruled that Scope 3 emissions are part of the indirect effects of the project and thus must be considered in the EIA. The case was, however, dismissed because after it was filed, the EPA amended the terms of reference for the Hammerhead project to include Scope 3 emissions. Nonetheless, the court aligned itself with international climate law by legally recognising that the EIAs must include assessment of indirect emissions.
Morris and Marcus, in 2025, brought the EPA back to court for their failure to comply with the original court ruling. This case is currently ongoing.
Schlumberger
Schlumberger had sought environmental approval from the EPA for the construction and operation of a source storage and calibration facility in Houston, intended to store radioactive materials. The EPA determined that an EIA was not necessary as the project would not significantly affect the environment or human health. The citizens of Houston, upon hearing of the project, disagreed and asked the court to declare the EPA’s decision to waive the EIA as unlawful as they felt their health and community were indeed at significant risk due to their proximity to the facility.
The EPA argued that the order should not be revoked as the facility had already been built and operations had started. The Court sided with the applicants and declared the decision of the EPA to not conduct an EIA into the effects of the construction of the facility was ultra vires, unreasonable, and irrational for breaching the Act. The Court issued an injunction restraining Schlumberger from its operations until a lawfully issued permit was granted by the EPA.Poppins; color: rgb(245, 245, 245); font-weight: 400; font-size: 101%;">Phone: +(592) 227-4629<